In order to achieve this, we used dipped mounting clamps to adjust the angle of the solar PV panels to make sure the system passed the glint and glare assessment.
We also used mono-modules in order to increase the efficiency of the system, optimise the performance and give it a sleeker appearance which kept it in align with assessment requirements.
The Result
The system was finalised and completed after an eight-week programme during the winter months. It was essential to our client that the site remained operational during the site’s upgrade, so we worked hard to prevent any disruption for their operations.
The solar PV system was installed using their current LV panel board, and additionally came with a SE Smart Metre to monitor for optimum performance.