Challenge
The site presented several logistical and technical challenges, including a 400-metre cable run from the array to the point of connection.
We also had to coordinate our works with other contractors on-site, all while navigating wet and difficult winter conditions.
To tackle the long-distance cable run efficiently, we specified a 300kW Huawei 800V inverter, which significantly reduced the cable size required—helping to keep installation costs down.