Ultra-rapid charging points, a leading solution for commercial EV charging station installations, rated at 100-200 kW. Charging your EV at this rate takes around 10 to 20 minutes depending on mileage range and storage capacity in kWh.
These stations are typically installed at motorway service stations, making them ideal for drivers intend to stop only briefly. These are often installed on motorway service stations or EV charging forecourts, ideal for locations with drivers that arrive with the intention of only stopping for a short while.
Ultra-rapid aims to benchmark its charging cycle against the time taken to fill a standard petrol or diesel car petrol tank. Ultra-rapid chargers almost certainly need dedicated electrical infrastructure to install and connect. They often need their own dedicated transformer and LV Switchboard to allow connection to the national grid or business at MV/HV.
Please note that adding ultra-rapid EV charging points to any businesses’ electrical distribution system needs an electrical design and load assessment as you may not have the capacity to install multiple EV points without an electrical upgrade. Considering a commercial EV charger installation ensures that your business is equipped to meet the growing demand for electric vehicle.